New Rio Tinto IVMS Specs Every Contractor Must Meet

Rio Tinto IVMS and DFDM Specs for Contractors | V5.0 (2026) | Group 1, 2 and 3 Requirements Rio Tinto’s Version 5.0 IVMS and Driver Fatigue & Distraction Monitoring (DFDM) specification introduces a risk-based framework that defines the safety technology requirements contractors must meet before mobilising across Pilbara operations. While existing systems installed before the […]